Renovating a unit, townhouse or villa can be a great way to gain a better kitchen, bathroom or more usable living space. But strata renovation approval requirements can stop a good project in its tracks when they are left until the builder is ready to start. In a Sydney strata scheme, the work inside your lot may still affect common property, neighbouring residents, building services or the structure of the building.

The practical approach is simple: confirm what you want to change, read the by-laws early and get written approval before materials arrive on site. This avoids disputes, delays and the cost of changing plans halfway through the job.

Why strata approval is needed

Owning a strata lot does not always mean you can alter every part of it without permission. Floors, ceilings, exterior walls, windows, balconies, plumbing risers, waterproofing membranes and structural elements are commonly treated as common property. Even work that appears minor can create noise, water or structural risks for other owners.

Your scheme’s by-laws set the rules, while the owners corporation decides whether a proposal needs approval and what conditions apply. A strata managing agent can explain the submission process, but the by-laws and the resolution of the owners corporation are what count.

Approval is separate from any requirement for council approval, a complying development certificate or building certification. A project may need one, both or neither, depending on its scope. Removing a non-load-bearing internal wall, for example, may be straightforward from a planning perspective but still require strata consent. Removing a structural wall is a different level of work again and needs proper investigation, engineering and approvals.

The strata renovation approval requirements to check first

Start with a current copy of your scheme’s registered by-laws. Many NSW schemes have renovation by-laws that group work into categories such as cosmetic, minor or major renovations. The names and rules can vary between buildings, so do not rely on what happened in another apartment or what a neighbour was allowed to do years ago.

Cosmetic work is often the least complicated. Painting internal walls, hanging pictures, replacing loose furniture or installing carpet may be allowed without a formal owners corporation resolution. Even then, there may be rules around work hours, lift bookings, rubbish removal and protecting common areas.

Minor renovations can include replacing a kitchen, installing hard flooring, changing internal doors, or renovating a bathroom where common property is not affected. Approval may be required, particularly where the work could affect waterproofing, plumbing, noise transfer or building appearance.

Major renovations generally involve structural changes, waterproofing, external appearance, services or common property. These works usually need approval by special resolution at a general meeting and may require a specific by-law. The exact process depends on the scheme and the proposed work.

Hard flooring deserves special attention. A new timber, hybrid or tiled floor can look excellent, but impact noise travels quickly through apartment buildings. Your scheme may specify an acoustic rating, underlay requirements or approval from an acoustic consultant. Installing the floor first and asking questions later is an expensive mistake.

What a strong approval application looks like

A vague request such as “renovating kitchen and bathroom” gives a strata committee very little to assess. A clear application shows that you have considered the building, your neighbours and the practical management of the work.

For a typical renovation, the owners corporation may ask for a scope of works, plans or sketches, product details, contractor licence and insurance information, proposed work dates and a contact person. For more involved alterations, expect to provide engineering details, hydraulic or electrical information, waterproofing specifications, acoustic reports and evidence of any required statutory approvals.

It also helps to explain how the site will be managed. State where trades will park, how materials will be brought in, whether a lift needs protection or booking, where rubbish will go and how common areas will be kept clean. In a tight Sydney unit block, these details are often what reassures the committee that the job will be properly controlled.

If the work affects common property, approval conditions may deal with future maintenance and liability. For example, an owner who installs a new bathroom waterproofing system, external awning or altered services may be responsible for maintaining that addition. Read these conditions carefully before agreeing, as they can continue to apply when the lot is sold.

Bathrooms, kitchens and wall removals need closer planning

Bathroom renovations are one of the most common strata projects, and one of the easiest to get wrong. Waterproofing protects more than your own bathroom. A failure can damage the ceiling, walls and contents of the lot below, then turn a contained upgrade into a costly insurance and repair issue.

Before bathroom work starts, confirm where the waterproofing membrane ends and what parts are common property. Use licensed trades where required, keep records of the work and make sure the renovation follows the approved scope. Moving a floor waste, toilet or shower may also involve plumbing and drainage considerations that are not obvious from the room layout.

Kitchens can raise similar issues where plumbing, gas, ventilation or electrical circuits are being relocated. A like-for-like cabinet and benchtop replacement is different from moving the sink across the room, adding a new gas appliance or cutting into a wall for an exhaust duct.

Wall removals should never be judged by appearance alone. A wall that looks like a simple partition may conceal services, carry loads or contribute to fire or acoustic separation. Before any demolition, have the wall assessed properly. If structural support is required, the design, beam installation and certification need to be addressed before the work is presented to strata and before a builder starts opening up the space.

Do not confuse committee support with formal approval

A friendly conversation with a committee member is useful, but it is not approval. Neither is an email from a building manager saying the work “should be fine”. Follow the process set out in your by-laws and wait for the written decision or resolution required for your type of renovation.

Timing matters as well. General meetings, committee meetings and requests for further information can add weeks to a programme. If you are buying appliances, booking trades or planning to move out during works, build this time into the schedule. Rushing a builder to start before the paperwork is complete puts everyone in a difficult position.

Once approval is granted, stick to the approved plans and conditions. If you decide to enlarge an opening, change flooring, move plumbing or add work that was not included in the application, pause and check whether a variation needs further consent. The cleanest projects are the ones where the approved scope, the builder’s quote and the work on site all match.

A practical pre-start checklist

Before locking in your renovation date, make sure you can answer these questions:

  • Have you read the current by-laws and confirmed the correct approval pathway?
  • Does the scope affect common property, structure, waterproofing, services, external appearance or acoustic performance?
  • Have you supplied the drawings, specifications, licences, insurance and reports requested by the owners corporation?
  • Are required council, certifier or engineering approvals in place?
  • Do you have written strata approval, including all work-hour, access, protection and rubbish conditions?
  • Does your builder understand the building rules and the exact approved scope?

A capable builder can help prepare a clear scope and identify the construction information that may be needed, but strata approval remains the lot owner’s responsibility. For structural alterations, bathroom upgrades and full renovations, WizBuilt brings the practical site knowledge needed to plan the work properly from the outset.

If approval is refused or conditions seem unreasonable

A refusal is not always the end of the project. Sometimes the issue is missing information, unclear drawings, an unsuitable product or concern about how the work will affect other residents. Ask for the reasons in writing, then address the specific concern rather than resubmitting the same broad request.

There are cases where a condition is sensible, such as requiring acoustic underlay or waterproofing records. There are also cases where an owner may need independent strata or legal advice, particularly if the proposal is reasonable but the process has stalled. The right next step depends on the by-laws, the nature of the work and whether common property is involved.

Good renovations in strata buildings start well before demolition day. Take the time to get the scope right, secure the correct written approval and appoint trades who respect the building as much as the finished room. That is how you improve your home without creating a problem for the people living on the other side of the wall.